Erection and dismantling of scaffolding
2026-04-28
Installation requirements:
The foundation of the scaffold should be flat and solid, with a bearing capacity that meets the design requirements. Good basic drainage to avoid settlement caused by waterlogging.
Before installation, a special construction plan should be prepared to clarify the installation sequence, structural requirements, safety measures, etc. The plan must be reviewed and approved by professional engineers before implementation.
During the construction process, it is necessary to strictly follow the requirements of the plan to ensure that the spacing and connection methods of the members meet the design requirements.
Protective railings and toe boards should be installed on the outside of the scaffold, and the operating layer must be fully covered with scaffold boards and equipped with protective facilities.
Demolition requirements:
Before dismantling, a comprehensive inspection should be conducted to ensure that the fastening connections, wall connecting components, and support systems of the scaffolding meet the structural requirements.
According to the inspection results, supplement and improve the demolition sequence and measures in the construction plan, and implement them after approval by the competent department.
Demolition work must be carried out layer by layer from top to bottom, and simultaneous work from top to bottom is strictly prohibited. The connecting wall components must be dismantled layer by layer along with the scaffold, and it is strictly prohibited to dismantle the entire or several layers of the connecting wall components before dismantling the scaffold.
The dismantled rods and accessories should be promptly classified and neatly stacked for easy transportation and storage.